![]()
A) KTM Komuter B) KLIA Ekspres C) KLIA Transit D) Rapid KL
A) XKL B) KUL C) KLM D) KLA
A) 14 April 2010 B) 14 April 2005 C) 14 April 2002 D) 14 October 2002
A) Malaysia Airlines and Batik Air B) AirAsia and Firefly C) Emirates and Qatar Airways D) Malindo Air and Singapore Airlines
A) At the western end of the station B) At the underground level C) At the eastern end of the station D) At the rooftop level
A) MRT Circle Line B) MRT Shah Alam Line C) MRT Kajang Line D) MRT Putrajaya Line
A) KTM ETS Line B) Batu Caves–Pulau Sebang Line C) Tanjung Malim–Port Klang Line D) KL Sentral–Terminal Skypark Line
A) Newly opened B) Suspended C) Under maintenance D) Fully operational
A) KL Sentral-City B) KL Sentral-LRT C) KL Sentral-Rapid D) KL Sentral-redONE
A) At the western end of the station B) At the mezzanine level C) In the center of the building D) At the eastern end of the station
A) Padang Besar B) Salak Tinggi C) Subang Jaya D) Ipoh
A) KLIA Ekspres B) Kelana Jaya Line C) KTM ETS D) KTM Intercity
A) Yes, but only for domestic flights B) Yes C) No D) Yes, but only for international flights
A) Terminal Skypark B) Padang Besar C) Port Klang D) Batu Caves
A) Long-distance intercity service B) Commuter-style service with stops in between C) Freight-only service D) Non-stop luxury service
A) An entertainment hub B) A financial area C) A residential block D) A transportation depot
A) Lot H B) Lot B C) Lot E D) Lot F
A) Sentral Plaza B) Stesen Sentral C) NU Sentral D) KL Sentral Mall
A) South B) East C) West D) North
A) 2020 B) 2001 C) 2014 D) 2008
A) 999 years B) 99 years C) 50 years D) 30 years
A) Sentral Terminal B) KL Sentral Hub C) Stesen Sentral D) NU Sentral
A) 2000 B) 2001 C) 2008 D) 2014
A) Six B) Ten C) Four D) Eight
A) Over 1 million B) Over 50,000 C) Over 100,000 D) Over 500,000
A) 500,000 B) 1,200,000 C) 546,000 D) 600,000
A) Two blocks B) Four blocks C) Five blocks D) Three blocks
A) June 2001 B) September 2003 C) May 2005 D) March 2004
A) 2001 B) 2004 C) 2006 D) 2007
A) Five towers B) Three towers C) Four towers D) Two towers
A) PricewaterhouseCoopers B) MRCB C) General Electric D) British Telecom
A) United Engineers (M) Bhd B) Maxis Communications C) Quill Realty Sdn Bhd D) Lembaga Tabung Haji
A) 26-storey B) 18-storey C) 30-storey D) 35-storey
A) 35-storey B) 30-storey C) 18-storey D) 26-storey
A) Quill Realty Sdn Bhd B) United Engineers (M) Bhd C) MRCB D) Lembaga Tabung Haji
A) Plaza Sentral B) 1 Sentral Tower C) Quill 7 D) Mercu UEM
A) Malaysian Industrial Development Authority B) British Telecom C) PricewaterhouseCoopers D) General Electric
A) Mercu UEM B) Quill 7 C) 1 Sentral Tower D) Plaza Sentral
A) December 2007 B) September 2003 C) June 2001 D) 2006
A) 26-storey B) 18-storey C) 30-storey D) Six-storey
A) 2007 B) 2001 C) 2003 D) 2006
A) Maxis Communications B) PricewaterhouseCoopers C) Malaysian Industrial Development Authority D) British Telecom
A) More than 50% B) Less than 25% C) Exactly 75% D) Exactly 40%
A) 2008 B) 2020 C) 2011 D) 2015
A) CIMB Financial Hub B) Menara CIMB C) CIMB Centre D) CIMB Plaza
A) Merdeka Square B) Petronas Towers C) KL Tower D) National Museum
A) July 2008 B) June 2011 C) December 2005 D) July 2007
A) 2011 B) 2015 C) 2007 D) 2008
A) Butterworth Central Station B) Krung Thep Aphiwat Central Terminal C) Johor Bahru Sentral D) Kuala Lumpur International Airport
A) Prasarana Integrated Development B) Lim Zhengyan C) Kisho Kurokawa D) Malaysian Resources Corporation Berhad
A) 2001 B) 2015 C) 2019 D) 2025
A) MRCB B) Prasarana C) limzhengyan D) Kisho Kurokawa
A) 1994 B) 2010 C) 2001 D) 1945
A) Jalan Damansara B) Jalan Tun Sambanthan C) Jalan Bukit Bintang D) Jalan Ampang
A) 100 metres B) 200 metres C) 500 metres D) 1 kilometre
A) Spanish solution B) Island platform C) Terminal bay D) Side platform
A) Audio announcements B) Guided handrails C) Braille maps D) Tactile paving
A) Via a skybridge B) By walking through Jalan Tun Sambanthan C) Via an underground tunnel D) Via a dedicated shuttle bus
A) It is a transfer hub only B) It is an under-construction station C) It is a terminus D) It is an intermediate station
A) An underground footbridge B) An overhead monorail C) A city shuttle bus D) A dedicated elevator
A) T851 B) 800 C) 500 D) T819
A) 2017 B) 2015 C) 2014 D) 2016
A) 208 B) 400 C) 600 D) 55
A) 55-storey B) 37-storey C) 40-storey D) 38-storey
A) 600 B) 208 C) 55 D) 400
A) 50% B) 60% C) 40% D) 20%
A) 400 B) 1000 C) 600 D) 208
A) 770 B) 641 C) 782 D) 710
A) 650 B) 652 C) 651 D) 641
A) Hilton Kuala Lumpur B) Suasana Sentral C) St. Regis Hotel D) The Sentral Residences |