Stockholm Arlanda Airport - Quiz
Stockholm Arlanda Airport
  • 1. How many terminals does Arlanda currently operate?
A) Five
B) Three
C) Two
D) Four
  • 2. What is the status of Terminal 1 at Arlanda?
A) It is used exclusively for cargo
B) It was closed permanently in 2019
C) It is currently under renovation
D) It was never built
  • 3. Which terminal was Terminal 4 incorporated into?
A) Terminal 2
B) Terminal 5
C) Terminal 3
D) Terminal 1
  • 4. What happened to Terminal 3?
A) It is exclusively for domestic flights
B) It is being incorporated into Terminal 2
C) It was demolished in 2020
D) It serves as the main international hub
  • 5. What major change occurred between Terminals 4 and 5 in 2022?
A) They became exclusively for cargo
B) They were both demolished
C) They were rebranded as Terminal 1
D) They were connected airside
  • 6. What was the name of the new remote gate facility opened in 2024?
A) The Satellite Terminal
B) Gate Area B
C) Gate Area A
D) Terminal 6
  • 7. Who inaugurated Terminal 2 in 1990?
A) Prince Bertil
B) The King of Sweden
C) The CEO of SAS
D) The Prime Minister
  • 8. What was Terminal 2 initially named?
A) Schengen Terminal
B) Terminal South
C) Arlanda International
D) Inrikes 2
  • 9. Why was Terminal 2 originally designed without security checks?
A) Security was not required in 1990
B) It was for passengers with hand luggage only
C) Security was handled on the aircraft
D) It was an open-access facility
  • 10. What year did SAS move its domestic operations out of Terminal 2?
A) 2013
B) 2001
C) 1992
D) 1990
  • 11. When was Terminal 2 reconfigured to handle exclusively international flights?
A) 2010
B) 2001
C) 1992
D) 2020
  • 12. How much was Terminal 2 expanded during the 2013 refurbishment?
A) 1,000 square meters
B) 5,000 square meters
C) 2,500 square meters
D) 10,000 square meters
  • 13. What is the name of the train station shared by Terminal 2, 3, and 4?
A) Arlanda South Station
B) Arlanda Central
C) Arlanda North Station
D) Stockholm Express Station
  • 14. Can passengers travel between Terminal 2 and Terminal 5 without a new security check?
A) Only with airline staff supervision
B) No
C) Yes
D) Only during peak hours
  • 15. Which airline moved its international flights from Terminal 2 to Terminal 5 in 2012?
A) SAS
B) Finnair
C) Norwegian
D) British Airways
  • 16. During which years was Terminal 2 closed due to COVID-19?
A) 2021–2022
B) 2019–2020
C) 2018–2021
D) 2020–2021
  • 17. Which airline maintained only four domestic arrivals and departures at Arlanda after April 6, 2020?
A) Braathens Regional Airlines
B) Norwegian
C) SAS
D) Swedavia
  • 18. Which destination was the only one served by Norwegian from Arlanda after the pandemic cancellations?
A) Oslo
B) Helsinki
C) Stockholm
D) Copenhagen
  • 19. By what percentage did passenger figures drop in April 2020 compared to April 2019?
A) 80%
B) 99.9%
C) 97.7%
D) 90%
  • 20. What did Swedavia build to help with congestion between Terminal 4 and Terminal 5?
A) A new shuttle train
B) A security bypass bridge
C) A pedestrian tunnel
D) An underground walkway
  • 21. When did the new pedestrian tunnel and Terminal 4 reopen?
A) Spring 2022
B) End of June 2022
C) September 2022
D) October 2022
  • 22. Which airline announced the relocation of its operations from Bromma to Arlanda in September 2024?
A) SAS
B) Norwegian
C) Braathens Regional Airlines
D) Swedavia
  • 23. What is the expected impact of Braathens Regional Airlines moving to Arlanda on Bromma Airport?
A) No significant impact
B) Complete closure within a month
C) Loss of around 90% of traffic
D) An increase in international traffic
  • 24. In what year was Terminal 4 incorporated into Terminal 5?
A) 2022
B) 2026
C) 2025
D) 2024
  • 25. When was Terminal 3 closed?
A) September 2022
B) September 2026
C) September 2025
D) September 2024
  • 26. What was the state of monthly passenger figures in early 2021 compared to 2019?
A) Nearly 20% less
B) More than 50% less
C) More than 97% less
D) More than 80% less
  • 27. What is the IATA code for Stockholm Arlanda Airport?
A) ESSA
B) STO
C) ARN
D) BMA
  • 28. In which municipality is Arlanda Airport located?
A) Stockholm
B) Sigtuna
C) Uppsala
D) Upplands Väsby
  • 29. How far is Arlanda from Stockholm?
A) 37 km
B) 7 km
C) 40 km
D) 100 km
  • 30. How many passengers used Arlanda in 2017?
A) Nearly 35 million
B) Nearly 15 million
C) Nearly 21 million
D) Nearly 27 million
  • 31. When did King Gustaf VI Adolf open Arlanda Airport?
A) 1 April 1983
B) 1 April 1962
C) 1 April 2003
D) 1 April 1992
  • 32. In what year did domestic traffic move from Bromma to Arlanda?
A) 1962
B) 1983
C) 1992
D) 1990
  • 33. When was the third runway at Arlanda built?
A) 1998-2002
B) 2010-2014
C) 1990-1992
D) 2003-2005
  • 34. Why is the third runway at Arlanda only used during peak hours?
A) Space restrictions
B) High maintenance costs
C) Technical failure
D) Environmental reasons
  • 35. Which airport serves as the IATA code for the Stockholm Metropolitan Area?
A) ARN
B) ESSA
C) BMA
D) STO
  • 36. In what year did the first Airbus A380 land at Arlanda?
A) 2017
B) 2010
C) 2003
D) 2014
  • 37. What is the rank of Arlanda among Nordic airports by size?
A) Third-largest
B) Fourth-largest
C) Second-largest
D) Largest
  • 38. Which year did Terminal 3 originally open?
A) 1990
B) 1992
C) 2003
D) 1976
  • 39. What is the walking distance between Terminal 2 and the former Terminal 3?
A) 500 metres
B) 200 metres
C) 100 metres
D) 1 kilometre
  • 40. Which airlines commenced operations from Terminal 3 in October 2024?
A) Lufthansa and KLM
B) PopulAir, Jonair and Västflyg
C) Ryanair and Wizz Air
D) SAS and Norwegian
  • 41. Who inaugurated the Terminal 5 expansion in 2003?
A) King Carl XVI Gustaf
B) The Mayor of Stockholm
C) Ulrika Messing
D) The CEO of Arlanda
  • 42. When was Arlanda North Station opened?
A) 1999
B) 2003
C) 1976
D) 2020
  • 43. What technology was included in the new Terminal 5 security facility opened in 2023?
A) CT scanners
B) Facial recognition cameras
C) Automated lane luggage systems
D) Full body scanners
  • 44. What is the name of the future pier planned for Terminal 5?
A) Pier 3
B) Pier G
C) Pier A
D) Pier North
  • 45. When was the F gate expansion inaugurated?
A) 17 December 1983
B) 17 December 1990
C) 17 December 2003
D) 17 December 2006
  • 46. Since which year have some F gates been able to support the Airbus A380?
A) 2020
B) 2022
C) 2018
D) 2003
  • 47. In what year did Linjeflyg and SAS relocate operations from Bromma to Arlanda?
A) 1984
B) 1983
C) 1992
D) 1990
  • 48. When did Terminal 4 undergo its first major renovation since 1983?
A) 2006
B) 1999
C) 2018
D) 2022
  • 49. Why did Terminal 4 close in spring 2020?
A) The merger with Terminal 2
B) A major construction project
C) The COVID-19 pandemic
D) The Swedish financial crisis
  • 50. Where was the airside walkway constructed to link the C gates with Terminal 5?
A) Inside the D pier
B) Above the runway
C) Beneath Sky City
D) Next to the Arlanda North station
  • 51. Which gates are now part of Terminal 5 and handle both domestic and international traffic?
A) C30–C44
B) E1–E10
C) D11–D24
D) F26–F69
Created with That Quiz — where test making and test taking are made easy for math and other subject areas.