A) 80 km/h B) 40 km/h C) 60 km/h D) 100 km/h
A) 40 km/h B) 30 km/h C) 60 km/h D) 50 km/h
A) The police station B) A weigh station C) A service area D) The nearest exit
A) Speeders' vehicle licence numbers B) Traffic congestion reports C) Speed limit reminders D) Weather warnings
A) One week in jail B) Loss of driving licence C) Immediate ban from Beijing D) Confiscation of the vehicle
A) CN¥1,000 B) CN¥2,000 C) CN¥500 D) CN¥5,000
A) Fifty B) Twenty C) Ten D) Five
A) GPRS wireless network B) Bluetooth C) Fiber optic cables D) Satellite uplink
A) By rolling into an upward hill full of pebbles B) By using hydraulic barriers C) By alerting the police to clear the road D) By opening emergency exit ramps
A) No accidents of any kind B) Fewer traffic jams C) No fatal accidents in 200 days D) A 50% reduction in crashes
A) To pay tolls B) To check cars for mechanical problems C) To weigh the vehicle D) To measure vehicle emissions
A) N. 3rd Ring Road B) N. 6th Ring Road C) N. 5th Ring Road D) N. 4th Ring Road
A) Mentougou B) Badaling C) Yanqing D) Changping
A) Changes name to Badaling National Highway B) The road terminates C) Joins a local city road D) Continues as Jingzhang Expressway
A) X B) T C) A D) S
A) 61.9 kilometres B) 50 kilometres C) 75.5 kilometres D) 100 kilometres
A) January 1996 B) October 1996 C) October 1998 D) January 1998
A) Badaling B) Kangzhuang C) Madian D) Juyongguan
A) 6 lanes B) 4 lanes C) 8 lanes D) 2 lanes
A) Kangzhuang B) Shangqing Bridge C) Juyongguan Pass D) Madian Overpass
A) A steep uphill climb B) A series of toll gates C) Continuous curves heading downward D) Construction zones
A) 30-35 B) 60-61.9 C) 50-55 D) 10-15
A) Badaling B) Juyongguan C) Shuiguan D) Nankou
A) Jianxiang Bridge B) Madian C) Baige D) Shangqing Bridge |