Øresund Bridge - Quiz
Øresund Bridge
  • 1. What is the name of the artificial island where the western part of the bridge joins the Øresund Tunnel?
A) Peberholm
B) Kastrup
C) Amager
D) Saltholm
  • 2. Which natural island is Peberholm named to complement?
A) Funen
B) Saltholm
C) Amager
D) Zealand
  • 3. What does Peberholm translate to in English?
A) Tunnel Land
B) Salt Islet
C) Bridge Island
D) Pepper Islet
  • 4. Where did the large stones used to line Peberholm come from?
A) Kastrup, Amager
B) Kungshamn, Bohuslän
C) Copenhagen, Denmark
D) Malmö, Sweden
  • 5. Which local stone was also used alongside foreign stones to line Peberholm?
A) Scanian stone from Dalby
B) Limestone from Gotland
C) Sandstone from Bornholm
D) Granite from Stockholm
  • 6. What is the approximate length of Peberholm?
A) 2 km
B) 4 km
C) 6 km
D) 10 km
  • 7. What is the average width of Peberholm?
A) 500 m
B) 200 m
C) 1,000 m
D) 50 m
  • 8. What is the height of Peberholm?
A) 5 m
B) 100 m
C) 50 m
D) 20 m
  • 9. What happens to the railroad at Peberholm regarding the highway?
A) It merges into a single track with the highway
B) It turns off the highway and runs parallel to it down into the tunnel
C) It stops completely on the island
D) It goes over the highway on a bridge
  • 10. What facility exists on Peberholm for emergencies like road accidents?
A) A hospital
B) A helipad
C) An airport
D) A fire station
  • 11. What is the status of Peberholm regarding public access?
A) It is a public park open to everyone
B) It is entirely populated by residential communities
C) It is a private industrial zone with no access
D) It is a nature reserve and public visits are generally not allowed outside the highway
  • 12. How has the nature on Peberholm been allowed to develop?
A) Via regular controlled burns and planting
B) Through intensive landscaping by botanists
C) Without active human intervention
D) By introducing invasive agricultural species
  • 13. What kind of species have established themselves on Peberholm?
A) No plants or animals at all
B) Several rare species
C) Exclusively marine mammals
D) Only common household pets
  • 14. On which Danish island is the artificial peninsula at Kastrup located?
A) Funen
B) Saltholm
C) Zealand
D) Amager
  • 15. Which fairway does the Øresund Tunnel descend under?
A) Skagerrak fairway
B) Baltic fairway
C) Kattegat fairway
D) Drogden fairway
  • 16. What is the exact length of the Øresund Tunnel?
A) 4.05 km
B) 2.18 km
C) 1.50 km
D) 5.51 km
  • 17. Where does the Øresund Tunnel come up on Amager?
A) Kastrup Village
B) Copenhagen Central Station
C) Copenhagen Airport
D) Malmö Central Station
  • 18. What was the main reason for continuing the link underwater through a tunnel instead of a bridge?
A) Deep water prevented bridge construction
B) Environmental laws banned bridges
C) Strong underwater currents required a tunnel
D) A bridge would pose a risk to air traffic
  • 19. How long is the immersed tube section of the Øresund Tunnel?
A) 0.27 km
B) 2.70 km
C) 4.05 km
D) 3.51 km
  • 20. How long are the entry tunnels at each end of the Øresund Tunnel?
A) 500 m
B) 100 m
C) 1,000 m
D) 270 m
  • 21. How many prefabricated reinforced concrete segments make up the tube tunnel?
A) 5
B) 10
C) 20
D) 50
  • 22. What is the weight of each prefabricated concrete segment in the Øresund Tunnel?
A) 10,000 tonnes
B) 5,500 tonnes
C) 100,000 tonnes
D) 55,000 tonnes
  • 23. How are the concrete segments of the Øresund Tunnel connected?
A) Glued using marine epoxy on dry land
B) Bolted together by deep-sea divers
C) Interconnected in a trench dug in the seabed
D) Welded together above water and sunk
  • 24. How many tubes in the Øresund Tunnel carry railway tracks?
A) One
B) Two
C) Three
D) Four
  • 25. What is the purpose of the small fifth tube in the Øresund Tunnel?
A) Extra freight trains
B) Emergencies
C) Ventilation only
D) Utilities and electricity
  • 26. How are the tubes in the Øresund Tunnel arranged?
A) Separated into two different tunnels
B) Stacked vertically
C) Side by side
D) In a circular formation
  • 27. Why can freight trains carrying dangerous goods not be in the same tunnel tube at the same time as other trains?
A) To save electricity
B) Because of weight limits
C) For safety reasons
D) Due to electrical interference
  • 28. What does the restriction on freight trains carrying dangerous goods do to the tunnel?
A) Has no effect on capacity
B) Reduces capacity slightly
C) Doubles the travel time
D) Closes the tunnel during transport
  • 29. Which road does the highway connect to on the Swedish side?
A) Outer Ring Road in Malmö
B) Øresundsmotorvejen
C) Continental Highway
D) Stockholm Ring Road
  • 30. Which road does the highway connect to on the Danish side?
A) Copenhagen Inner Ring
B) Amager Motorway
C) Outer Ring Road
D) Øresundsmotorvejen
  • 31. Which railway station does the Øresund Line connect to on the Danish side?
A) Copenhagen Central Station
B) Kastrup Station
C) Roskilde Station
D) Copenhagen Airport Station
  • 32. Which railway lines does the Øresund Line connect to on the Swedish side?
A) The Northern Coastal Line
B) Gothenburg Express Line
C) Malmö City Tunnel and the Continental Line
D) Stockholm Central Line
  • 33. Where is the Copenhagen Airport railway station situated?
A) On Peberholm island
B) Inside Copenhagen Central Station
C) In downtown Malmö
D) Right at Copenhagen Airport, just west of the Øresund Tunnel entrance
  • 34. What station is located right next to the Copenhagen Airport railway station?
A) Malmö Central Station
B) Kastrup Metro Station
C) Lufthavnen station of the Copenhagen Metro
D) Amager West Station
  • 35. What is located near the Copenhagen Airport railway station besides the metro?
A) Connecting tracks to a maintenance workshop
B) A ferry terminal
C) A customs clearance office
D) A major freight depot
  • 36. What allows freight trains to pass without going past the platforms near Copenhagen Airport?
A) A movable bridge
B) A freight-only schedule
C) An underground bypass tunnel
D) A separate freight track
  • 37. What issue is caused by crossing freight trains near Copenhagen Airport?
A) They require diesel engines
B) They reduce capacity
C) They cause structural damage
D) They block road traffic
  • 38. When was the Malmö City Tunnel completed on the Swedish side?
A) Year 2000
B) Year 1995
C) End of 2010
D) At the opening of the Øresund Link
  • 39. How long after the opening of the Øresund Link was the Malmö City Tunnel completed?
A) Only a few months
B) Exactly five years
C) More than a decade
D) Two decades
  • 40. Where did all trains have to run before the Malmö City Tunnel was completed?
A) Directly through the city center on surface tracks
B) Through an older underwater tunnel
C) They could not reach Malmö
D) On the Continental Line around Malmö
  • 41. Why did trains going further north in Malmö have to turn around before the City Tunnel was built?
A) Due to a break in the tracks
B) Because the station was a terminus
C) Because of voltage differences
D) To switch drivers
  • 42. Where does the Malmö City Tunnel allow trains to travel directly to from the Øresund Link?
A) Gothenburg Station
B) Lund Central Station
C) Stockholm Central Station
D) Malmö Central Station
  • 43. Where is the Malmö City Tunnel located relative to the city?
A) Elevated above the streets
B) Along the coastline
C) Around the northern perimeter
D) Under the city
  • 44. Is a Helsingborg-Helsingør tunnel still included in infrastructure planning?
A) No
B) Only for freight trains
C) Yes
D) Permanently banned by international treaty
  • 45. When did the Danish and Swedish governments agree to build the link?
A) 23 March 1991
B) 1 July 2000
C) 15 June 1985
D) 10 November 1995
  • 46. What was the name of the Danish company created for the project?
A) Dansk-svenska broförbindelsen A/S
B) A/S Øresundsforbindelsen
C) Svedab AB
D) Øresundsbro Konsortiet
  • 47. What was the name of the Swedish company created for the project?
A) A/S Øresundsforbindelsen
B) Svensk-danska broförbindelsen AB, Svedab AB
C) Nordic Bridge Company AB
D) Skåne-Sjælland Trafik AB
  • 48. What ownership stake did the Danish and Swedish companies have in the joint Øresundsbro Konsortiet?
A) A private consortium held 50%
B) Denmark owned 70% and Sweden 30%
C) Sweden owned 65% and Denmark 35%
D) Half-owners
  • 49. Which country showed the most interest in adding a bicycle lane during construction?
A) Norway
B) Germany
C) Sweden
D) Denmark
  • 50. What was the estimated cost of adding a bicycle lane according to DTU?
A) SEK 1.2 billion
B) SEK 210 million
C) SEK 50 million
D) SEK 500 million
  • 51. How did the Swedish department of the bridge company respond to the proposal for a bicycle lane?
A) Said no
B) Delayed the decision for five years
C) Agreed to fund half of it
D) Approved it immediately
  • 52. In which country's political debate was the bridge a recurring feature for decades?
A) Denmark
B) Sweden
C) Norway
D) Finland
  • 53. On what grounds did many commentators oppose the bridge's construction?
A) Military vulnerability
B) Financial bankruptcy risks
C) Environmental grounds
D) Cultural heritage loss
  • 54. Which Swedish political party long maintained opposition to the bridge as a central issue?
A) The Centre Party
B) The Social Democrats
C) The Moderate Party
D) The Left Party
  • 55. Which party leader resigned from Carl Bildt's government in protest against the bridge?
A) Thorbjörn Fälldin
B) Anders Wijkman
C) Carl Bildt
D) Olof Johansson
  • 56. What ranking does the bridge have in length among bridges in Europe?
A) Third longest
B) Fourth longest
C) Longest
D) Second longest
  • 57. What European route is carried by the roadway of the bridge?
A) E4
B) E6
C) E20
D) E45
  • 58. How long is the bridge section from the Swedish coast to the artificial island?
A) 4 kilometres
B) 12 kilometres
C) Nearly 8 kilometres
D) 2 kilometres
  • 59. In what year did construction of the Øresund Bridge begin?
A) 1988
B) 1991
C) 1995
D) 2000
  • 60. Between which years was the Great Belt Fixed Link constructed?
A) 1988–1998
B) 1995–2000
C) 1980–1990
D) 1991–1995
  • 61. What acts as the backbone of Internet data transmission between central Europe and Sweden across the link?
A) An underwater wireless tower
B) A fiber-optic rail line
C) A satellite relay
D) A data cable
  • 62. Who was one of the designers of the bridge from Ove Arup & Partners?
A) Niels Gimsing
B) Klaus Falbe Hansen
C) Jørgen Nissen
D) Georg Rotne
  • 63. What award did the bridge receive in 2002?
A) European Civil Engineering Prize
B) Baltic Sea Infrastructure Prize
C) World Bridge Architecture Award
D) IABSE Outstanding Structure Award
  • 64. When were ideas for a fixed link across the Øresund first advanced?
A) Mid 20th century
B) World War I
C) Late 1800s
D) Early 1950s
  • 65. In what year were proposals put to the Swedish Parliament for a railway tunnel across the strait?
A) 1954
B) 1936
C) 1910
D) 1973
  • 66. In which decade was the first Øresund Delegation appointed to investigate bridge conditions?
A) 1930s
B) 1980s
C) 1970s
D) 1950s
  • 67. In what year did the governments of Denmark and Sweden eventually sign an agreement to build a fixed link the first time?
A) 1978
B) 1973
C) 1962
D) 1991
  • 68. In which decade did economic improvement renew interest in the bridge project?
A) 1980s
B) 1970s
C) 1990s
D) 1960s
  • 69. How many entries were submitted in the design competition?
A) Eight
B) Two
C) Four
D) Six
  • 70. Which of the following architects designed one of the entries in the competition?
A) Norman Foster
B) Georg Rotne
C) ASO Group
D) Santiago Calatrava
  • 71. Who was the architect for the ASO Group proposal?
A) Georg Rotne
B) Norman Foster
C) COWI
D) Santiago Calatrava
  • 72. What material was mainly proposed for the bridge by the ASO Group?
A) Stone
B) Steel
C) Concrete
D) Wood
  • 73. What did the ØLC proposal place highway and rail in?
A) The same plane
B) Underground tunnels
C) Opposite sides of the strait
D) Two separate levels
  • 74. What type of bridge material did ØLC propose?
A) Concrete
B) Iron
C) Steel
D) Aluminum
  • 75. Over which location did both groups advocate an inclined cable-stayed bridge?
A) Flintrännan
B) Peberholm
C) Malmo
D) Copenhagen
  • 76. Which company formed the ASO Group?
A) Arup Group
B) Sundlink Contractors
C) VBB
D) COWI
  • 77. When did the European Commission receive a complaint alleging unlawful State aid?
A) July 2014
B) 17 April 2013
C) End of 1992
D) November 1995
  • 78. When did the European Commission approve the public involvement as not being state aid?
A) December 1992
B) April 2013
C) July 2014
D) November 1995
  • 79. What force did the bridge spans have to be able to withstand?
A) 120 MN
B) 61 MN
C) 35 MN
D) 210 MN
  • 80. What was the minimum required lifespan of the bridge?
A) 200 years
B) 100 years
C) 50 years
D) 30 years
  • 81. What was taken in the area before the detailed design of the bridge?
A) Traffic census counts
B) Wind tunnel tests
C) Many borehole samples
D) Water temperature measurements
  • 82. Who was given great freedom to design details and processes within the owners' specifications?
A) The local governments
B) Sundlink
C) The European Union
D) The subcontractors
  • 83. At what level were changes made to the design on an ongoing basis?
A) Structural level
B) Financial level
C) Detailed level
D) Global level
  • 84. What was the name of the world's largest hammerhead crane barge used during construction?
A) Great Belt
B) The Swan
C) Svanen
D) Norra hamnen
  • 85. What standards for structural design were used to bridge language and cultural differences among subcontractors?
A) Eurocodes
B) ISO standards
C) Canadian structural standards
D) Nordic building codes
  • 86. Sweden's decision to apply for membership in which organization was a motivation for regional development around the Øresund?
A) United Nations
B) Nordic Council
C) European Community
D) European Union
  • 87. On what date was the completion of the bridge celebrated by Crown Prince Frederik and Crown Princess Victoria?
A) 14 August 1999
B) 12 June 2000
C) 15 October 1998
D) 1 July 2000
  • 88. How many runners competed in Broloppet, the half marathon, on 12 June 2000?
A) 15,200
B) 79,871
C) 25,000
D) 35,600
  • 89. By what percentage did traffic between Denmark and Sweden increase in the first year after the bridge opened?
A) 90 percent
B) 61 percent
C) 31 percent
D) 75 percent
  • 90. What was a likely reason why traffic levels were not as high as expected initially?
A) Strict customs controls
B) Frequent train delays
C) High tolls
D) Poor road conditions
  • 91. What was the cost to cross the bridge by car in 2012 in Euros?
A) €55
B) €31
C) €25
D) €43
  • 92. Which storm caused occasional brief closures of the bridge in October 2013?
A) Cyclone Gudrun
B) Hurricane Katrina
C) St. Jude storm
D) Storm Lothar
  • 93. Where were the steel spans manufactured?
A) London, United Kingdom
B) Copenhagen, Denmark
C) Norra hamnen, Sweden
D) Puerto Real near Cádiz, Spain
  • 94. Which company manufactured the steel spans?
A) Svanen
B) Sundlink
C) British Steel
D) Dragados Offshore
  • 95. What surrounds the pylons of the main span and three piers on either side?
A) Inspection gondolas
B) Concrete troughs
C) Thermal expansion joints
D) Underwater reefs
  • 96. Where were both the caissons and pylons manufactured?
A) Puerto Real, Spain
B) Norra hamnen
C) Cádiz, Spain
D) British Steel factories
  • 97. Why was a cable-stayed design chosen instead of a suspension bridge?
A) Cable-stayed bridges are easier to anchor in limestone bedrock
B) Suspension bridges could become unstable if heavy trains brake sharply
C) Suspension bridges are too expensive to build over water
D) Cable-stayed bridges allow higher vehicle speeds
  • 98. What does the lower level of the main span consist of?
A) A continuous railway deck
B) Pylon crossbeams
C) A concrete roadway
D) Steel outriggers
  • 99. What are the brackets used for suspension in the pylon cables called?
A) Outriggers
B) Caissons
C) Dampers
D) Bearings
  • 100. How often are the outriggers placed along the bridge?
A) Every ten meters
B) Every thirty meters
C) Every fifty meters
D) Every hundred meters
Created with That Quiz — the site for test creation and grading in math and other subjects.