A) Rapid KL B) KLIA Ekspres C) KTM Komuter D) KLIA Transit
A) KLM B) KLA C) KUL D) XKL
A) 14 April 2005 B) 14 April 2002 C) 14 October 2002 D) 14 April 2010
A) Malindo Air and Singapore Airlines B) Emirates and Qatar Airways C) Malaysia Airlines and Batik Air D) AirAsia and Firefly
A) At the western end of the station B) At the rooftop level C) At the underground level D) At the eastern end of the station
A) MRT Shah Alam Line B) MRT Circle Line C) MRT Putrajaya Line D) MRT Kajang Line
A) KTM ETS Line B) KL Sentral–Terminal Skypark Line C) Tanjung Malim–Port Klang Line D) Batu Caves–Pulau Sebang Line
A) Suspended B) Under maintenance C) Newly opened D) Fully operational
A) KL Sentral-LRT B) KL Sentral-City C) KL Sentral-Rapid D) KL Sentral-redONE
A) At the eastern end of the station B) In the center of the building C) At the western end of the station D) At the mezzanine level
A) Padang Besar B) Salak Tinggi C) Subang Jaya D) Ipoh
A) KTM ETS B) KTM Intercity C) KLIA Ekspres D) Kelana Jaya Line
A) Yes, but only for domestic flights B) No C) Yes, but only for international flights D) Yes
A) Terminal Skypark B) Port Klang C) Padang Besar D) Batu Caves
A) Freight-only service B) Non-stop luxury service C) Long-distance intercity service D) Commuter-style service with stops in between
A) A transportation depot B) A financial area C) An entertainment hub D) A residential block
A) Lot E B) Lot B C) Lot H D) Lot F
A) KL Sentral Mall B) Stesen Sentral C) NU Sentral D) Sentral Plaza
A) West B) South C) East D) North
A) 2001 B) 2020 C) 2014 D) 2008
A) 999 years B) 50 years C) 99 years D) 30 years
A) KL Sentral Hub B) Stesen Sentral C) NU Sentral D) Sentral Terminal
A) 2014 B) 2001 C) 2008 D) 2000
A) Six B) Eight C) Ten D) Four
A) Over 100,000 B) Over 500,000 C) Over 50,000 D) Over 1 million
A) 546,000 B) 600,000 C) 1,200,000 D) 500,000
A) Two blocks B) Three blocks C) Four blocks D) Five blocks
A) September 2003 B) May 2005 C) March 2004 D) June 2001
A) 2007 B) 2006 C) 2004 D) 2001
A) Two towers B) Five towers C) Four towers D) Three towers
A) British Telecom B) MRCB C) General Electric D) PricewaterhouseCoopers
A) Lembaga Tabung Haji B) United Engineers (M) Bhd C) Quill Realty Sdn Bhd D) Maxis Communications
A) 35-storey B) 18-storey C) 30-storey D) 26-storey
A) 35-storey B) 18-storey C) 26-storey D) 30-storey
A) United Engineers (M) Bhd B) Quill Realty Sdn Bhd C) Lembaga Tabung Haji D) MRCB
A) Quill 7 B) Plaza Sentral C) Mercu UEM D) 1 Sentral Tower
A) General Electric B) Malaysian Industrial Development Authority C) PricewaterhouseCoopers D) British Telecom
A) Mercu UEM B) Plaza Sentral C) 1 Sentral Tower D) Quill 7
A) June 2001 B) 2006 C) December 2007 D) September 2003
A) Six-storey B) 18-storey C) 30-storey D) 26-storey
A) 2001 B) 2006 C) 2003 D) 2007
A) British Telecom B) Maxis Communications C) PricewaterhouseCoopers D) Malaysian Industrial Development Authority
A) Exactly 40% B) Less than 25% C) More than 50% D) Exactly 75%
A) 2011 B) 2008 C) 2020 D) 2015
A) CIMB Plaza B) CIMB Financial Hub C) Menara CIMB D) CIMB Centre
A) National Museum B) KL Tower C) Petronas Towers D) Merdeka Square
A) December 2005 B) June 2011 C) July 2007 D) July 2008
A) 2008 B) 2007 C) 2011 D) 2015
A) Johor Bahru Sentral B) Butterworth Central Station C) Kuala Lumpur International Airport D) Krung Thep Aphiwat Central Terminal
A) Lim Zhengyan B) Prasarana Integrated Development C) Kisho Kurokawa D) Malaysian Resources Corporation Berhad
A) 2001 B) 2025 C) 2015 D) 2019
A) limzhengyan B) MRCB C) Prasarana D) Kisho Kurokawa
A) 1945 B) 2010 C) 2001 D) 1994
A) Jalan Damansara B) Jalan Ampang C) Jalan Bukit Bintang D) Jalan Tun Sambanthan
A) 100 metres B) 200 metres C) 1 kilometre D) 500 metres
A) Spanish solution B) Terminal bay C) Island platform D) Side platform
A) Guided handrails B) Audio announcements C) Braille maps D) Tactile paving
A) Via an underground tunnel B) By walking through Jalan Tun Sambanthan C) Via a dedicated shuttle bus D) Via a skybridge
A) It is an under-construction station B) It is an intermediate station C) It is a terminus D) It is a transfer hub only
A) An overhead monorail B) An underground footbridge C) A dedicated elevator D) A city shuttle bus
A) 800 B) T851 C) T819 D) 500
A) 2015 B) 2016 C) 2017 D) 2014
A) 400 B) 600 C) 55 D) 208
A) 40-storey B) 55-storey C) 37-storey D) 38-storey
A) 208 B) 600 C) 55 D) 400
A) 20% B) 60% C) 50% D) 40%
A) 600 B) 208 C) 1000 D) 400
A) 782 B) 770 C) 710 D) 641
A) 651 B) 650 C) 641 D) 652
A) St. Regis Hotel B) Hilton Kuala Lumpur C) The Sentral Residences D) Suasana Sentral |