ThatQuiz Test Library Take this test now
Stockholm Arlanda Airport - Quiz
Contributed by: Fry
  • 1. How many terminals does Arlanda currently operate?
A) Three
B) Five
C) Four
D) Two
  • 2. What is the status of Terminal 1 at Arlanda?
A) It was closed permanently in 2019
B) It is currently under renovation
C) It was never built
D) It is used exclusively for cargo
  • 3. Which terminal was Terminal 4 incorporated into?
A) Terminal 3
B) Terminal 5
C) Terminal 2
D) Terminal 1
  • 4. What happened to Terminal 3?
A) It is being incorporated into Terminal 2
B) It serves as the main international hub
C) It is exclusively for domestic flights
D) It was demolished in 2020
  • 5. What major change occurred between Terminals 4 and 5 in 2022?
A) They were connected airside
B) They became exclusively for cargo
C) They were rebranded as Terminal 1
D) They were both demolished
  • 6. What was the name of the new remote gate facility opened in 2024?
A) Gate Area B
B) Gate Area A
C) Terminal 6
D) The Satellite Terminal
  • 7. Who inaugurated Terminal 2 in 1990?
A) The CEO of SAS
B) The Prime Minister
C) The King of Sweden
D) Prince Bertil
  • 8. What was Terminal 2 initially named?
A) Terminal South
B) Arlanda International
C) Schengen Terminal
D) Inrikes 2
  • 9. Why was Terminal 2 originally designed without security checks?
A) It was for passengers with hand luggage only
B) Security was not required in 1990
C) It was an open-access facility
D) Security was handled on the aircraft
  • 10. What year did SAS move its domestic operations out of Terminal 2?
A) 1992
B) 2013
C) 1990
D) 2001
  • 11. When was Terminal 2 reconfigured to handle exclusively international flights?
A) 1992
B) 2001
C) 2020
D) 2010
  • 12. How much was Terminal 2 expanded during the 2013 refurbishment?
A) 5,000 square meters
B) 2,500 square meters
C) 1,000 square meters
D) 10,000 square meters
  • 13. What is the name of the train station shared by Terminal 2, 3, and 4?
A) Arlanda North Station
B) Stockholm Express Station
C) Arlanda South Station
D) Arlanda Central
  • 14. Can passengers travel between Terminal 2 and Terminal 5 without a new security check?
A) No
B) Only with airline staff supervision
C) Only during peak hours
D) Yes
  • 15. Which airline moved its international flights from Terminal 2 to Terminal 5 in 2012?
A) Norwegian
B) Finnair
C) SAS
D) British Airways
  • 16. During which years was Terminal 2 closed due to COVID-19?
A) 2021–2022
B) 2018–2021
C) 2020–2021
D) 2019–2020
  • 17. Which airline maintained only four domestic arrivals and departures at Arlanda after April 6, 2020?
A) SAS
B) Norwegian
C) Swedavia
D) Braathens Regional Airlines
  • 18. Which destination was the only one served by Norwegian from Arlanda after the pandemic cancellations?
A) Stockholm
B) Copenhagen
C) Helsinki
D) Oslo
  • 19. By what percentage did passenger figures drop in April 2020 compared to April 2019?
A) 99.9%
B) 80%
C) 90%
D) 97.7%
  • 20. What did Swedavia build to help with congestion between Terminal 4 and Terminal 5?
A) A pedestrian tunnel
B) A new shuttle train
C) A security bypass bridge
D) An underground walkway
  • 21. When did the new pedestrian tunnel and Terminal 4 reopen?
A) September 2022
B) End of June 2022
C) Spring 2022
D) October 2022
  • 22. Which airline announced the relocation of its operations from Bromma to Arlanda in September 2024?
A) Swedavia
B) Norwegian
C) Braathens Regional Airlines
D) SAS
  • 23. What is the expected impact of Braathens Regional Airlines moving to Arlanda on Bromma Airport?
A) No significant impact
B) Loss of around 90% of traffic
C) Complete closure within a month
D) An increase in international traffic
  • 24. In what year was Terminal 4 incorporated into Terminal 5?
A) 2025
B) 2024
C) 2026
D) 2022
  • 25. When was Terminal 3 closed?
A) September 2026
B) September 2025
C) September 2022
D) September 2024
  • 26. What was the state of monthly passenger figures in early 2021 compared to 2019?
A) More than 50% less
B) More than 97% less
C) Nearly 20% less
D) More than 80% less
  • 27. What is the IATA code for Stockholm Arlanda Airport?
A) ESSA
B) BMA
C) ARN
D) STO
  • 28. In which municipality is Arlanda Airport located?
A) Sigtuna
B) Stockholm
C) Upplands Väsby
D) Uppsala
  • 29. How far is Arlanda from Stockholm?
A) 100 km
B) 40 km
C) 37 km
D) 7 km
  • 30. How many passengers used Arlanda in 2017?
A) Nearly 15 million
B) Nearly 35 million
C) Nearly 21 million
D) Nearly 27 million
  • 31. When did King Gustaf VI Adolf open Arlanda Airport?
A) 1 April 1983
B) 1 April 2003
C) 1 April 1962
D) 1 April 1992
  • 32. In what year did domestic traffic move from Bromma to Arlanda?
A) 1962
B) 1990
C) 1992
D) 1983
  • 33. When was the third runway at Arlanda built?
A) 1990-1992
B) 1998-2002
C) 2003-2005
D) 2010-2014
  • 34. Why is the third runway at Arlanda only used during peak hours?
A) Technical failure
B) High maintenance costs
C) Environmental reasons
D) Space restrictions
  • 35. Which airport serves as the IATA code for the Stockholm Metropolitan Area?
A) BMA
B) ESSA
C) ARN
D) STO
  • 36. In what year did the first Airbus A380 land at Arlanda?
A) 2014
B) 2003
C) 2010
D) 2017
  • 37. What is the rank of Arlanda among Nordic airports by size?
A) Fourth-largest
B) Largest
C) Second-largest
D) Third-largest
  • 38. Which year did Terminal 3 originally open?
A) 1990
B) 1992
C) 1976
D) 2003
  • 39. What is the walking distance between Terminal 2 and the former Terminal 3?
A) 100 metres
B) 500 metres
C) 1 kilometre
D) 200 metres
  • 40. Which airlines commenced operations from Terminal 3 in October 2024?
A) Ryanair and Wizz Air
B) PopulAir, Jonair and Västflyg
C) SAS and Norwegian
D) Lufthansa and KLM
  • 41. Who inaugurated the Terminal 5 expansion in 2003?
A) The Mayor of Stockholm
B) King Carl XVI Gustaf
C) Ulrika Messing
D) The CEO of Arlanda
  • 42. When was Arlanda North Station opened?
A) 1976
B) 2020
C) 2003
D) 1999
  • 43. What technology was included in the new Terminal 5 security facility opened in 2023?
A) CT scanners
B) Full body scanners
C) Facial recognition cameras
D) Automated lane luggage systems
  • 44. What is the name of the future pier planned for Terminal 5?
A) Pier North
B) Pier G
C) Pier 3
D) Pier A
  • 45. When was the F gate expansion inaugurated?
A) 17 December 2006
B) 17 December 1990
C) 17 December 2003
D) 17 December 1983
  • 46. Since which year have some F gates been able to support the Airbus A380?
A) 2020
B) 2003
C) 2018
D) 2022
  • 47. In what year did Linjeflyg and SAS relocate operations from Bromma to Arlanda?
A) 1990
B) 1983
C) 1992
D) 1984
  • 48. When did Terminal 4 undergo its first major renovation since 1983?
A) 2018
B) 2006
C) 2022
D) 1999
  • 49. Why did Terminal 4 close in spring 2020?
A) A major construction project
B) The COVID-19 pandemic
C) The Swedish financial crisis
D) The merger with Terminal 2
  • 50. Where was the airside walkway constructed to link the C gates with Terminal 5?
A) Inside the D pier
B) Above the runway
C) Next to the Arlanda North station
D) Beneath Sky City
  • 51. Which gates are now part of Terminal 5 and handle both domestic and international traffic?
A) F26–F69
B) D11–D24
C) C30–C44
D) E1–E10
Created with That Quiz — where test making and test taking are made easy for math and other subject areas.