A) IEC 62061 B) IEC 61511 C) IEC 62279 D) ISO 26262
A) Mobile Instrumentation Software Reliability Association B) Manufacturing Industry Safety Reliability Association C) Motor Industry Software Reliability Association D) Motorized Integrated System Reliability Association
A) November 1994 B) January 1990 C) December 1998 D) November 2000
A) Railway signaling protocols B) Guidelines on using C and C++ languages C) Manufacturing process automation D) Nuclear power plant instrumentation
A) IEC 62061 B) IEC 61511 C) IEC 62279 D) IEC 61513
A) EN 62061 and EN 61513 B) EN 50262 and EN 50279 C) EN 61508 and EN 61511 D) EN 50128 and EN 50657
A) IEC 62279 B) IEC 61511 C) ISO 26262 D) IEC 62061
A) IEC 61511 B) ISO 26262 C) IEC 61513 D) IEC 62061
A) IEC 61513 B) IEC 61511 C) IEC 62279 D) IEC 62061
A) IEC B) ISO C) CENELEC D) MISRA
A) The de facto standard for embedded C programming B) A voluntary recommendation for hardware design C) An outdated set of guidelines D) The primary language for railway signaling
A) Petrochemical B) Automotive manufacturing C) Railway signaling D) Machinery assembly
A) Automotive engine control units B) Nuclear reactor cooling systems C) Machinery safety-related electrical control systems D) Railway track switching systems
A) Safety implementation level B) System integrity level C) System improvement level D) Safety integrity level
A) Five B) Two C) Four D) Three
A) A measure of software speed B) A measure of hardware cost C) A measure of design quality D) A measure of physical durability
A) The highest SC rating of the devices used B) The smallest SC rating of the devices used C) The total sum of all device SC ratings D) The average SC rating of all devices
A) Once per year B) More than once per year C) Less than once per year D) Twice per decade
A) More than once per year B) Exactly ten times per year C) Less than or equal to once per year D) More than twice per year
A) Allowable frequency of dangerous failure B) Allowable response latency C) Allowable number of user interactions D) Allowable probability of demand failure
A) To attest that a product meets certification requirements B) To write the original IEC 61508 standard C) To act as the national government regulator D) To manufacture safety-certified products
A) The IEC central office stamp B) International Patent Law C) Multilateral Recognition Arrangement (MLA) D) Direct government mandates
A) Certification scheme B) Safety charter C) Auditor guide D) Compliance manual
A) ILAC B) ISO C) TÜV Rheinland D) IAF
A) 3 B) 10 C) 16 D) 7
A) Part 4 B) Parts 14–16 C) Parts 5–7 D) Parts 1–3
A) 5 B) 16 C) 3 D) 7
A) Phases 14–16 B) Phases 6–13 C) Phases 1–5 D) Phases 1–16
A) Zero risk is only required for high-hazard industries B) Zero risk can never be reached C) Zero risk is achievable through perfect design D) Zero risk is the primary objective of the standard
A) Non-tolerable risks must be reduced B) All risks must be eliminated regardless of cost C) Risk reduction is optional for small systems D) Risks are only evaluated at the design phase
A) Tolerable if cost of reduction exceeds improvement B) Unacceptable in any circumstance C) Acceptable as it stands D) Undesirable but potentially tolerable
A) Operational maintenance procedures B) General definitions C) Programmable electronics D) Mechanical devices
A) 2010 B) 1998 C) 2005 D) 2000
A) Phases 14–16 B) Phases 1–5 C) Phases 1–7 D) Phases 6–13
A) Part 7 B) Part 3 C) Part 4 D) Part 1
A) Object coverage B) Statement coverage C) Line coverage D) MC/DC
A) A Unit Testing tool B) A compiler only C) A network analyzer D) A word processor
A) Mining B) Household appliances C) Aerospace D) Automotive
A) C. O'Brien B) D. Smith C) W. Goble D) M.J.M. Houtermans
A) 40 pages B) 430 pages C) 458 pages D) 150 pages |