Mike O'Callaghan–Pat Tillman Memorial Bridge - Quiz
Contributed by: Drew
  • 1. Who led the project design team for the Mike O'Callaghan–Pat Tillman Memorial Bridge?
A) The Hoover Support team
B) HDR, Inc.
C) Sverdrup Civil, Inc.
D) T.Y. Lin International
  • 2. What is the total length of the Mike O'Callaghan–Pat Tillman Memorial Bridge?
A) 1,900 feet
B) 840 feet
C) 1,060 feet
D) 900 feet
  • 3. How high above the Colorado River is the bridge roadway?
A) 1,900 feet
B) 1,060 feet
C) 900 feet
D) 840 feet
  • 4. What kind of bridge is this in terms of construction materials?
A) All-steel suspension
B) Reinforced concrete beam
C) Concrete-and-steel composite arch
D) Prestressed concrete truss
  • 5. Which of the following describes the bridge's arch?
A) Widest concrete arch in the Western Hemisphere
B) Widest steel arch in the world
C) Narrowest concrete arch in the United States
D) Tallest arch in the world
  • 6. How high is the arch above the Colorado River?
A) 900 feet
B) 1,900 feet
C) 840 feet
D) 1,060 feet
  • 7. What connects the twin arch ribs?
A) Steel cables
B) Suspension cables
C) Steel struts
D) Concrete beams
  • 8. Why was the composite design selected for the bridge?
A) For schedule and cost control
B) To make it the tallest bridge in the world
C) To increase the bridge length
D) To allow for a wider roadway
  • 9. Who referred to the bridge as 'an American triumph'?
A) The Hoover Support team
B) Sean Holstege
C) HDR, Inc.
D) USA Today
  • 10. What did USA Today call the bridge on October 18, 2010?
A) America's Newest Wonder
B) The Hoover Dam Bridge
C) The Concrete Arch Wonder
D) An American triumph
  • 11. Is the Hoover Dam visible from the roadway while driving across the bridge?
A) Only from the passenger side
B) Yes
C) No
D) Only during the day
  • 12. Where is the parking area for the bridge located?
A) At the bottom of the canyon
B) On the Arizona side
C) Directly on the bridge
D) On the Nevada side
  • 13. How do pedestrians get to the sidewalk across the bridge?
A) By a tunnel
B) By an elevator
C) By a shuttle service
D) By stairs and disabled access ramps
  • 14. How many lanes wide is the bridge?
A) Two
B) Six
C) Eight
D) Four
  • 15. What materials were used for the arch and columns?
A) Timber
B) Concrete
C) Steel
D) Aluminum
  • 16. What is the primary purpose of the Mike O'Callaghan–Pat Tillman Memorial Bridge?
A) To connect local residential areas
B) To serve as a dam overflow structure
C) To bypass the Hoover Dam
D) To provide a pedestrian walkway
  • 17. In what year did the bridge open to traffic?
A) 2012
B) 2010
C) 2001
D) 2005
  • 18. Who was Pat Tillman?
A) An American football player turned soldier
B) A Nevada state senator
C) The bridge construction manager
D) A project lead architect
  • 19. How far is the bridge located from Las Vegas?
A) Approximately 50 miles
B) Approximately 30 miles
C) Approximately 10 miles
D) Approximately 100 miles
  • 20. What is the total cost of the Hoover Dam Bypass project?
A) $114 million
B) $500 million
C) $350 million
D) $240 million
  • 21. How much did the bridge portion of the project cost?
A) $75 million
B) $114 million
C) $100 million
D) $240 million
  • 22. Which bridge is the only one higher than the O'Callaghan-Tillman bridge in the United States?
A) Glen Canyon Bridge
B) Royal Gorge Bridge
C) Golden Gate Bridge
D) New River Gorge Bridge
  • 23. The O'Callaghan-Tillman bridge holds the record for being the highest what in the U.S.?
A) Road bridge
B) Suspension bridge
C) Pedestrian bridge
D) Railroad bridge
  • 24. When did construction of the bridge itself begin?
A) October 2010
B) July 2001
C) March 2001
D) February 2005
  • 25. What was the alternative name for the route selection chosen in 2001?
A) Sugarloaf Mountain Alternative
B) Hoover Dam Bypass Route
C) Nevada-Arizona Link
D) Colorado River Bridge Route
  • 26. Which organization managed the bridge project starting in 1997?
A) Nevada Department of Transportation
B) Bureau of Reclamation
C) Federal Highway Administration
D) Arizona Department of Transportation
  • 27. What was the length of the detour for commercial trucks before the bridge was built?
A) 200 miles
B) 50 miles
C) 104 miles
D) 23 miles
  • 28. In what year did work begin on the approaches of the bridge?
A) 2005
B) 2006
C) 2003
D) 2004
  • 29. What caused a four-month delay in May 2006?
A) A permit problem regarding a concrete-batch plant
B) A shortage of steel materials
C) A flood in the Colorado River
D) A strike by construction workers
  • 30. Which construction worker died in an accident in November 2008?
A) Pat Tillman
B) Sherman Jones
C) John O'Callaghan
D) Robert Kraemer
  • 31. How many pieces make up the arches of the bridge?
A) 89 pieces
B) 106 pieces
C) 200 pieces
D) 53 pieces
  • 32. When were the twin arch spans completed?
A) March 2008
B) August 2009
C) December 2009
D) October 2010
  • 33. What was the final gap measurement between the two halves of the arch in August 2009?
A) 3/4 inch
B) 1 inch
C) 3/8 inch
D) 2 inches
  • 34. Which TV series featured the building of the bridge?
A) Mega Structures
B) Building Giants
C) Modern Marvels
D) Extreme Engineering
  • 35. In what year was the bridge given the added designation of Interstate 11?
A) 2018
B) 2020
C) 2010
D) 2015
  • 36. Who was responsible for the roadway surfacing on both approaches?
A) Vastco, Inc
B) Las Vegas Paving Corporation
C) Obayashi Corporation
D) Frehner Construction Company, Inc.
  • 37. How many concrete columns are on the Nevada side of the approach spans?
A) Five
B) Seven
C) Four
D) Two
Created with That Quiz — a math test site for students of all grade levels.