Øresund Bridge - Quiz
Contributed by: Cole
  • 1. What is the name of the artificial island where the western part of the bridge joins the Øresund Tunnel?
A) Saltholm
B) Kastrup
C) Amager
D) Peberholm
  • 2. Which natural island is Peberholm named to complement?
A) Amager
B) Zealand
C) Saltholm
D) Funen
  • 3. What does Peberholm translate to in English?
A) Tunnel Land
B) Pepper Islet
C) Salt Islet
D) Bridge Island
  • 4. Where did the large stones used to line Peberholm come from?
A) Copenhagen, Denmark
B) Kastrup, Amager
C) Malmö, Sweden
D) Kungshamn, Bohuslän
  • 5. Which local stone was also used alongside foreign stones to line Peberholm?
A) Granite from Stockholm
B) Limestone from Gotland
C) Scanian stone from Dalby
D) Sandstone from Bornholm
  • 6. What is the approximate length of Peberholm?
A) 4 km
B) 10 km
C) 2 km
D) 6 km
  • 7. What is the average width of Peberholm?
A) 200 m
B) 500 m
C) 1,000 m
D) 50 m
  • 8. What is the height of Peberholm?
A) 5 m
B) 50 m
C) 20 m
D) 100 m
  • 9. What happens to the railroad at Peberholm regarding the highway?
A) It turns off the highway and runs parallel to it down into the tunnel
B) It merges into a single track with the highway
C) It goes over the highway on a bridge
D) It stops completely on the island
  • 10. What facility exists on Peberholm for emergencies like road accidents?
A) A helipad
B) A hospital
C) A fire station
D) An airport
  • 11. What is the status of Peberholm regarding public access?
A) It is entirely populated by residential communities
B) It is a public park open to everyone
C) It is a nature reserve and public visits are generally not allowed outside the highway
D) It is a private industrial zone with no access
  • 12. How has the nature on Peberholm been allowed to develop?
A) Through intensive landscaping by botanists
B) Via regular controlled burns and planting
C) By introducing invasive agricultural species
D) Without active human intervention
  • 13. What kind of species have established themselves on Peberholm?
A) Exclusively marine mammals
B) Several rare species
C) Only common household pets
D) No plants or animals at all
  • 14. On which Danish island is the artificial peninsula at Kastrup located?
A) Funen
B) Saltholm
C) Zealand
D) Amager
  • 15. Which fairway does the Øresund Tunnel descend under?
A) Drogden fairway
B) Baltic fairway
C) Skagerrak fairway
D) Kattegat fairway
  • 16. What is the exact length of the Øresund Tunnel?
A) 5.51 km
B) 1.50 km
C) 2.18 km
D) 4.05 km
  • 17. Where does the Øresund Tunnel come up on Amager?
A) Kastrup Village
B) Malmö Central Station
C) Copenhagen Central Station
D) Copenhagen Airport
  • 18. What was the main reason for continuing the link underwater through a tunnel instead of a bridge?
A) A bridge would pose a risk to air traffic
B) Strong underwater currents required a tunnel
C) Deep water prevented bridge construction
D) Environmental laws banned bridges
  • 19. How long is the immersed tube section of the Øresund Tunnel?
A) 0.27 km
B) 3.51 km
C) 2.70 km
D) 4.05 km
  • 20. How long are the entry tunnels at each end of the Øresund Tunnel?
A) 500 m
B) 270 m
C) 100 m
D) 1,000 m
  • 21. How many prefabricated reinforced concrete segments make up the tube tunnel?
A) 20
B) 5
C) 50
D) 10
  • 22. What is the weight of each prefabricated concrete segment in the Øresund Tunnel?
A) 55,000 tonnes
B) 10,000 tonnes
C) 5,500 tonnes
D) 100,000 tonnes
  • 23. How are the concrete segments of the Øresund Tunnel connected?
A) Interconnected in a trench dug in the seabed
B) Welded together above water and sunk
C) Glued using marine epoxy on dry land
D) Bolted together by deep-sea divers
  • 24. How many tubes in the Øresund Tunnel carry railway tracks?
A) One
B) Four
C) Three
D) Two
  • 25. What is the purpose of the small fifth tube in the Øresund Tunnel?
A) Emergencies
B) Ventilation only
C) Extra freight trains
D) Utilities and electricity
  • 26. How are the tubes in the Øresund Tunnel arranged?
A) Side by side
B) Separated into two different tunnels
C) In a circular formation
D) Stacked vertically
  • 27. Why can freight trains carrying dangerous goods not be in the same tunnel tube at the same time as other trains?
A) To save electricity
B) Due to electrical interference
C) Because of weight limits
D) For safety reasons
  • 28. What does the restriction on freight trains carrying dangerous goods do to the tunnel?
A) Reduces capacity slightly
B) Closes the tunnel during transport
C) Doubles the travel time
D) Has no effect on capacity
  • 29. Which road does the highway connect to on the Swedish side?
A) Continental Highway
B) Øresundsmotorvejen
C) Stockholm Ring Road
D) Outer Ring Road in Malmö
  • 30. Which road does the highway connect to on the Danish side?
A) Amager Motorway
B) Øresundsmotorvejen
C) Outer Ring Road
D) Copenhagen Inner Ring
  • 31. Which railway station does the Øresund Line connect to on the Danish side?
A) Kastrup Station
B) Roskilde Station
C) Copenhagen Central Station
D) Copenhagen Airport Station
  • 32. Which railway lines does the Øresund Line connect to on the Swedish side?
A) Gothenburg Express Line
B) Malmö City Tunnel and the Continental Line
C) The Northern Coastal Line
D) Stockholm Central Line
  • 33. Where is the Copenhagen Airport railway station situated?
A) Inside Copenhagen Central Station
B) Right at Copenhagen Airport, just west of the Øresund Tunnel entrance
C) In downtown Malmö
D) On Peberholm island
  • 34. What station is located right next to the Copenhagen Airport railway station?
A) Kastrup Metro Station
B) Amager West Station
C) Malmö Central Station
D) Lufthavnen station of the Copenhagen Metro
  • 35. What is located near the Copenhagen Airport railway station besides the metro?
A) A major freight depot
B) A customs clearance office
C) Connecting tracks to a maintenance workshop
D) A ferry terminal
  • 36. What allows freight trains to pass without going past the platforms near Copenhagen Airport?
A) A freight-only schedule
B) An underground bypass tunnel
C) A separate freight track
D) A movable bridge
  • 37. What issue is caused by crossing freight trains near Copenhagen Airport?
A) They cause structural damage
B) They reduce capacity
C) They require diesel engines
D) They block road traffic
  • 38. When was the Malmö City Tunnel completed on the Swedish side?
A) Year 1995
B) Year 2000
C) At the opening of the Øresund Link
D) End of 2010
  • 39. How long after the opening of the Øresund Link was the Malmö City Tunnel completed?
A) Only a few months
B) Two decades
C) Exactly five years
D) More than a decade
  • 40. Where did all trains have to run before the Malmö City Tunnel was completed?
A) They could not reach Malmö
B) Directly through the city center on surface tracks
C) On the Continental Line around Malmö
D) Through an older underwater tunnel
  • 41. Why did trains going further north in Malmö have to turn around before the City Tunnel was built?
A) To switch drivers
B) Because the station was a terminus
C) Because of voltage differences
D) Due to a break in the tracks
  • 42. Where does the Malmö City Tunnel allow trains to travel directly to from the Øresund Link?
A) Malmö Central Station
B) Lund Central Station
C) Stockholm Central Station
D) Gothenburg Station
  • 43. Where is the Malmö City Tunnel located relative to the city?
A) Under the city
B) Around the northern perimeter
C) Along the coastline
D) Elevated above the streets
  • 44. Is a Helsingborg-Helsingør tunnel still included in infrastructure planning?
A) Permanently banned by international treaty
B) Only for freight trains
C) No
D) Yes
  • 45. When did the Danish and Swedish governments agree to build the link?
A) 23 March 1991
B) 10 November 1995
C) 15 June 1985
D) 1 July 2000
  • 46. What was the name of the Danish company created for the project?
A) Svedab AB
B) A/S Øresundsforbindelsen
C) Øresundsbro Konsortiet
D) Dansk-svenska broförbindelsen A/S
  • 47. What was the name of the Swedish company created for the project?
A) Skåne-Sjælland Trafik AB
B) A/S Øresundsforbindelsen
C) Svensk-danska broförbindelsen AB, Svedab AB
D) Nordic Bridge Company AB
  • 48. What ownership stake did the Danish and Swedish companies have in the joint Øresundsbro Konsortiet?
A) Half-owners
B) A private consortium held 50%
C) Sweden owned 65% and Denmark 35%
D) Denmark owned 70% and Sweden 30%
  • 49. Which country showed the most interest in adding a bicycle lane during construction?
A) Norway
B) Germany
C) Denmark
D) Sweden
  • 50. What was the estimated cost of adding a bicycle lane according to DTU?
A) SEK 210 million
B) SEK 50 million
C) SEK 1.2 billion
D) SEK 500 million
  • 51. How did the Swedish department of the bridge company respond to the proposal for a bicycle lane?
A) Delayed the decision for five years
B) Approved it immediately
C) Said no
D) Agreed to fund half of it
  • 52. In which country's political debate was the bridge a recurring feature for decades?
A) Sweden
B) Denmark
C) Norway
D) Finland
  • 53. On what grounds did many commentators oppose the bridge's construction?
A) Financial bankruptcy risks
B) Environmental grounds
C) Cultural heritage loss
D) Military vulnerability
  • 54. Which Swedish political party long maintained opposition to the bridge as a central issue?
A) The Centre Party
B) The Social Democrats
C) The Left Party
D) The Moderate Party
  • 55. Which party leader resigned from Carl Bildt's government in protest against the bridge?
A) Thorbjörn Fälldin
B) Olof Johansson
C) Anders Wijkman
D) Carl Bildt
  • 56. What ranking does the bridge have in length among bridges in Europe?
A) Third longest
B) Longest
C) Fourth longest
D) Second longest
  • 57. What European route is carried by the roadway of the bridge?
A) E20
B) E6
C) E4
D) E45
  • 58. How long is the bridge section from the Swedish coast to the artificial island?
A) 2 kilometres
B) 4 kilometres
C) Nearly 8 kilometres
D) 12 kilometres
  • 59. In what year did construction of the Øresund Bridge begin?
A) 1991
B) 1988
C) 1995
D) 2000
  • 60. Between which years was the Great Belt Fixed Link constructed?
A) 1995–2000
B) 1988–1998
C) 1980–1990
D) 1991–1995
  • 61. What acts as the backbone of Internet data transmission between central Europe and Sweden across the link?
A) A satellite relay
B) A data cable
C) A fiber-optic rail line
D) An underwater wireless tower
  • 62. Who was one of the designers of the bridge from Ove Arup & Partners?
A) Niels Gimsing
B) Jørgen Nissen
C) Klaus Falbe Hansen
D) Georg Rotne
  • 63. What award did the bridge receive in 2002?
A) IABSE Outstanding Structure Award
B) World Bridge Architecture Award
C) European Civil Engineering Prize
D) Baltic Sea Infrastructure Prize
  • 64. When were ideas for a fixed link across the Øresund first advanced?
A) Late 1800s
B) Mid 20th century
C) Early 1950s
D) World War I
  • 65. In what year were proposals put to the Swedish Parliament for a railway tunnel across the strait?
A) 1973
B) 1910
C) 1954
D) 1936
  • 66. In which decade was the first Øresund Delegation appointed to investigate bridge conditions?
A) 1970s
B) 1930s
C) 1950s
D) 1980s
  • 67. In what year did the governments of Denmark and Sweden eventually sign an agreement to build a fixed link the first time?
A) 1978
B) 1991
C) 1962
D) 1973
  • 68. In which decade did economic improvement renew interest in the bridge project?
A) 1960s
B) 1970s
C) 1990s
D) 1980s
  • 69. How many entries were submitted in the design competition?
A) Four
B) Six
C) Eight
D) Two
  • 70. Which of the following architects designed one of the entries in the competition?
A) Georg Rotne
B) Norman Foster
C) Santiago Calatrava
D) ASO Group
  • 71. Who was the architect for the ASO Group proposal?
A) Georg Rotne
B) Norman Foster
C) COWI
D) Santiago Calatrava
  • 72. What material was mainly proposed for the bridge by the ASO Group?
A) Wood
B) Steel
C) Stone
D) Concrete
  • 73. What did the ØLC proposal place highway and rail in?
A) The same plane
B) Two separate levels
C) Underground tunnels
D) Opposite sides of the strait
  • 74. What type of bridge material did ØLC propose?
A) Iron
B) Concrete
C) Aluminum
D) Steel
  • 75. Over which location did both groups advocate an inclined cable-stayed bridge?
A) Peberholm
B) Malmo
C) Flintrännan
D) Copenhagen
  • 76. Which company formed the ASO Group?
A) Arup Group
B) Sundlink Contractors
C) VBB
D) COWI
  • 77. When did the European Commission receive a complaint alleging unlawful State aid?
A) End of 1992
B) November 1995
C) July 2014
D) 17 April 2013
  • 78. When did the European Commission approve the public involvement as not being state aid?
A) April 2013
B) July 2014
C) December 1992
D) November 1995
  • 79. What force did the bridge spans have to be able to withstand?
A) 120 MN
B) 61 MN
C) 210 MN
D) 35 MN
  • 80. What was the minimum required lifespan of the bridge?
A) 200 years
B) 100 years
C) 50 years
D) 30 years
  • 81. What was taken in the area before the detailed design of the bridge?
A) Many borehole samples
B) Water temperature measurements
C) Traffic census counts
D) Wind tunnel tests
  • 82. Who was given great freedom to design details and processes within the owners' specifications?
A) The European Union
B) The local governments
C) The subcontractors
D) Sundlink
  • 83. At what level were changes made to the design on an ongoing basis?
A) Detailed level
B) Financial level
C) Global level
D) Structural level
  • 84. What was the name of the world's largest hammerhead crane barge used during construction?
A) Great Belt
B) The Swan
C) Svanen
D) Norra hamnen
  • 85. What standards for structural design were used to bridge language and cultural differences among subcontractors?
A) ISO standards
B) Eurocodes
C) Nordic building codes
D) Canadian structural standards
  • 86. Sweden's decision to apply for membership in which organization was a motivation for regional development around the Øresund?
A) Nordic Council
B) European Community
C) United Nations
D) European Union
  • 87. On what date was the completion of the bridge celebrated by Crown Prince Frederik and Crown Princess Victoria?
A) 1 July 2000
B) 12 June 2000
C) 14 August 1999
D) 15 October 1998
  • 88. How many runners competed in Broloppet, the half marathon, on 12 June 2000?
A) 15,200
B) 25,000
C) 79,871
D) 35,600
  • 89. By what percentage did traffic between Denmark and Sweden increase in the first year after the bridge opened?
A) 31 percent
B) 61 percent
C) 75 percent
D) 90 percent
  • 90. What was a likely reason why traffic levels were not as high as expected initially?
A) Frequent train delays
B) High tolls
C) Poor road conditions
D) Strict customs controls
  • 91. What was the cost to cross the bridge by car in 2012 in Euros?
A) €55
B) €31
C) €25
D) €43
  • 92. Which storm caused occasional brief closures of the bridge in October 2013?
A) St. Jude storm
B) Cyclone Gudrun
C) Hurricane Katrina
D) Storm Lothar
  • 93. Where were the steel spans manufactured?
A) Norra hamnen, Sweden
B) Copenhagen, Denmark
C) London, United Kingdom
D) Puerto Real near Cádiz, Spain
  • 94. Which company manufactured the steel spans?
A) Sundlink
B) Dragados Offshore
C) British Steel
D) Svanen
  • 95. What surrounds the pylons of the main span and three piers on either side?
A) Thermal expansion joints
B) Underwater reefs
C) Inspection gondolas
D) Concrete troughs
  • 96. Where were both the caissons and pylons manufactured?
A) Puerto Real, Spain
B) Norra hamnen
C) British Steel factories
D) Cádiz, Spain
  • 97. Why was a cable-stayed design chosen instead of a suspension bridge?
A) Cable-stayed bridges allow higher vehicle speeds
B) Cable-stayed bridges are easier to anchor in limestone bedrock
C) Suspension bridges could become unstable if heavy trains brake sharply
D) Suspension bridges are too expensive to build over water
  • 98. What does the lower level of the main span consist of?
A) A continuous railway deck
B) Pylon crossbeams
C) Steel outriggers
D) A concrete roadway
  • 99. What are the brackets used for suspension in the pylon cables called?
A) Bearings
B) Outriggers
C) Caissons
D) Dampers
  • 100. How often are the outriggers placed along the bridge?
A) Every hundred meters
B) Every thirty meters
C) Every ten meters
D) Every fifty meters